The Prep School has been expanded by the addition of a new second storey, a rooftop play area, and the total refurbishment of the existing spaces. The entire facade was replaced and a bridge link established to connect the adjacent school block. Much of the project was undertaken with the Prep School in occupation, while maximising productivity during the available holiday periods.
Forest School (Prep)
Sector
Education
Architect
Studio 54 Architecture
Structural Engineer
Hardman
Services Engineer
XCO2